Flood Alleviation Works on the River Tolka in Drumcondra, Dublin 3 

 

Client: Dublin City Council

Programme: Dec 2007 – Nov 2008 

Value: €1.3 million

Key Project Elements

  • Construction of Drumcondra pumping station as part of the flood alleviation works on the River Tolka 
  • Construction of an ESB substation Construction of reinforced concrete chambers including 3 large diameter dry mounted pumps 
  • The installation of 2 supplementary small flow pumps located in wet well 
  • The installation of 2 Flap Valves (Commissioned 2009) 
  • Construction of a pipeline, together with all manholes 
  • Construction of pre-cast culvert bridges, including wing walls & parapet walls

Back to Flood & Coastal Protection | Next