Final Capping Works at Ffridd Rasus Landfill Site in Harlech, Wales
Client: Gwynedd Council
Contract Term: Feb 2014 – Apr 2014
Contract Value: £0.48 million
Key Project Elements
- Shaping of waste body to design profile.
- Placing of 150mm of sub soil over shaped waste
- Deploy & weld lining layers, 2mm lldpe liner & surface water drainage geocomposite 20,000m2
- Placing of 750m of shale on-top of the HDPE Liner
- Installed drainage layers to the perimeter of the capped area
- Connected the gas wells to the existing flairs on-site