Adamstown Strategic Development Zone (SDZ)

Overview

Project: Adamstown Strategic Development Zone (SDZ) – Key Infrastructure Packages

Value: €10.15 Million

Duration: 2017 – 2021

Client: OCSC Consulting Engineers (on behalf of the Adamstown SDZ)

Background

As part of the strategic framework for up to 10,000 new homes in West Dublin, Priority Construction Ltd was appointed as Main Works Contractor and PSCS to deliver three critical infrastructure contracts within the Adamstown SDZ.

The works provided essential road, drainage, and public realm infrastructure to enable future residential development.

Key Achievements

  • Built 2.5km of new roads, including a 1km dual carriageway
  • Installed 1km of 1350mm diameter surface water culvert
  • Executed 35,000m³ of bulk earthworks
  • Installed 9km of utility ducting and 8.5km of kerbing
  • Constructed 6,500m² of footways and 70 street lights
  • Managed complex traffic systems in live environment

Project Innovation & Value

  • Halved required lamp stands through redesigned lighting layout
  • Used geogrids to reduce excavation depth and material import
  • Recycled 100% of excavated rock and existing road materials on-site
  • Installed hydro-brake tanks to treat surface water before release
  • Implemented GPS surveying and drone technology for precision monitoring

Proven Results in Every Sector

St Mary’s Public Park…

Remediation of a 4-hectare illegal dumping site within a protected… Read More

Read more

Construction of Biocore AD…

Civil works package for a new anaerobic digestion plant, including… Read More

Read more

Whitestown Emergency Remediation Works

Safe removal of municipal waste from directly beneath and adjacent… Read More

Read more

Remediation of Legacy Landfill,…

Transformation of a historic quarry landfill into a safe landscape… Read More

Read more

Construction of Coal Ash…

Lining and construction of a new coal ash containment cell… Read More

Read more

Graball Bay Road &…

Full road reconstruction and utility upgrade in Crosshaven, including a… Read More

Read more

Nether Dallachy Landfill Engineering…

Construction of a new engineered landfill cell (Phase 8) with… Read More

Read more

RR Craigmore | Cell…

Construction of a new landfill cell (Cell 9) and capping… Read More

Read more

Abbey Quarter Temporary Bus/Car…

Construction of a temporary multi-functional bus and car park to… Read More

Read more

Foxrock Carpark Redevelopment

Transformation of a disused former railway site into a modern… Read More

Read more