Project: Drehid Waste Management Facility Phase 15 Construction Works

Value: €2,330,000

Duration: August 2022 – April 2023

Client: Bord na Móna Recycling

Background

Located in Co. Kildare, the Drehid facility is a critical national infrastructure for non-hazardous waste. This project involved the design and construction of a new landfill cell (Phase XV) to provide essential void space for Ireland’s waste management needs.

Priority Construction Ltd was appointed as the principal Works Contractor and PSCS to deliver the complete project.

Key Achievements

  • Earthworks: Trimmed cell floor and embankments to design level using GPS-controlled plant.

  • Lining System: Installed a comprehensive cell lining system including:

    • 20,000m² of geo-textile filter layer.

    • 10,000m³ of engineered Bentonite Enhanced Soil (BES) liner.

    • 20,000m² of 2mm HDPE liner with geotextile protection.

    • 8,000 tonnes (500mm deep) of drainage stone.

  • Drainage & Utilities: Installed 750m of HDPE groundwater collection pipework, 350m of HDPE gas main, and over 300m of service ducting.

  • Civil Structures: Construction of an in-situ reinforced concrete headwall and 9 No. perimeter gas-monitoring boreholes.

  • Compliance: All works were executed under a rigorous Construction Quality Assurance (CQA) plan to EPA guidelines.

Environmental & Engineering Innovation

  • Deployed the country’s first Prinoth T14R 360° tracked dumpers to overcome challenging ground conditions, ensuring progress during poor weather without compromising the engineered liners.

  • Worked seamlessly with Bord na Móna’s operational team and key suppliers to coordinate logistics, ensuring zero disruption to live landfill operations.

  • Successfully managed site water to prevent contamination of natural watercourses, in full compliance with EPA regulations.

  • On-site batching and stockpiling of BES material ensured a consistent supply and streamlined the critical path lining activities.

Proven Results in Every Sector

St Mary’s Public Park…

Remediation of a 4-hectare illegal dumping site within a protected… Read More

Read more

Construction of Biocore AD…

Civil works package for a new anaerobic digestion plant, including… Read More

Read more

Whitestown Emergency Remediation Works

Safe removal of municipal waste from directly beneath and adjacent… Read More

Read more

Remediation of Legacy Landfill,…

Transformation of a historic quarry landfill into a safe landscape… Read More

Read more

Construction of Coal Ash…

Lining and construction of a new coal ash containment cell… Read More

Read more

Graball Bay Road &…

Full road reconstruction and utility upgrade in Crosshaven, including a… Read More

Read more

Nether Dallachy Landfill Engineering…

Construction of a new engineered landfill cell (Phase 8) with… Read More

Read more

RR Craigmore | Cell…

Construction of a new landfill cell (Cell 9) and capping… Read More

Read more

Abbey Quarter Temporary Bus/Car…

Construction of a temporary multi-functional bus and car park to… Read More

Read more

Foxrock Carpark Redevelopment

Transformation of a disused former railway site into a modern… Read More

Read more