Project: Nether Dallachy Phase 8 Landfill Engineering & Restoration Works
Value: £1.49 Million
Duration: July 2020 – March 2021
Client: The Moray Council

Background

This project involved the construction of a new engineered landfill cell (Phase 8) at the Nether Dallachy facility near Spey Bay, Scotland, while integrating containment systems with the adjacent Phase 7b area.

The works required advanced engineering to create environmentally secure containment and ensure regulatory compliance for waste management operations in Northeast Scotland.

Key Achievements

  • Constructed Phase 8 landfill cell with complete lining system integration to Phase 7b
  • Installed Bentonite Enhanced Soil (BES) liner meeting permeability requirement of ≤5.0×10⁻¹¹ m/sec
  • Completed 204m³ BES trial panel to validate installation methods and mix design
  • Installed 2.00mm HDPE geomembrane primary liner with protection geotextile and drainage systems
  • Conducted geophysical leak detection testing to verify liner integrity
  • Provided permanent litter fencing along southern, eastern and western boundaries

Project Outcome

  • Delivered project £256,896 under original contract value
  • Successfully validated BES performance through comprehensive trial panel testing
  • Maintained environmental compliance through rigorous quality assurance protocols
  • Supported local economy by hiring regional equipment suppliers and operators
  • Implemented effective dust management and surface water control measures
  • Completed works on schedule despite complex technical requirements and site integration challenges

Proven Results in Every Sector

St Mary’s Public Park…

Remediation of a 4-hectare illegal dumping site within a protected… Read More

Read more

Construction of Biocore AD…

Civil works package for a new anaerobic digestion plant, including… Read More

Read more

Whitestown Emergency Remediation Works

Safe removal of municipal waste from directly beneath and adjacent… Read More

Read more

Remediation of Legacy Landfill,…

Transformation of a historic quarry landfill into a safe landscape… Read More

Read more

Construction of Coal Ash…

Lining and construction of a new coal ash containment cell… Read More

Read more

Graball Bay Road &…

Full road reconstruction and utility upgrade in Crosshaven, including a… Read More

Read more

Nether Dallachy Landfill Engineering…

Construction of a new engineered landfill cell (Phase 8) with… Read More

Read more

RR Craigmore | Cell…

Construction of a new landfill cell (Cell 9) and capping… Read More

Read more

Abbey Quarter Temporary Bus/Car…

Construction of a temporary multi-functional bus and car park to… Read More

Read more

Foxrock Carpark Redevelopment

Transformation of a disused former railway site into a modern… Read More

Read more