Remediation of Legacy Landfill, Carragieen, Clane

Overview

Project: Remediation of Legacy Landfill at Carragieen, Clane
Value: €736,743
Duration: February 2023 – July 2023
Client: Kildare County Council

Background

This project involved the comprehensive remediation of a historic private landfill site located in a residential area south of Clane village. The works transformed a former quarry that had been used for waste disposal into a safe, stable landscape with new equestrian facilities and enhanced ecological value.

Key Achievements

  • Remediated 1-hectare legacy landfill through excavation and regrading of 2,000m³ material
  • Installed passive gas venting system with vertical trenches and lateral collection pipework
  • Constructed 470m of surface water filter drains (100mm & 150mm diameter)
  • Placed 3,500m³ of imported subsoil and topsoil capping material over geocomposite layer
  • Built new 1,050m² equestrian arena and 581m of fencing (post & rail and chainlink)
  • Completed landscaping with grass seeding and new tree planting including cherry blossom, beech and horse chestnut

Project Outcome

  • Successfully transformed former landfill into safe, usable community space
  • Enhanced local biodiversity through strategic tree planting and landscaping
  • Provided new equestrian facilities for community use
  • Ensured long-term environmental protection through engineered gas venting system
  • Maintained residential access and minimised disruption in sensitive location

Proven Results in Every Sector

St Mary’s Public Park…

Remediation of a 4-hectare illegal dumping site within a protected… Read More

Read more

Construction of Biocore AD…

Civil works package for a new anaerobic digestion plant, including… Read More

Read more

Whitestown Emergency Remediation Works

Safe removal of municipal waste from directly beneath and adjacent… Read More

Read more

Remediation of Legacy Landfill,…

Transformation of a historic quarry landfill into a safe landscape… Read More

Read more

Construction of Coal Ash…

Lining and construction of a new coal ash containment cell… Read More

Read more

Graball Bay Road &…

Full road reconstruction and utility upgrade in Crosshaven, including a… Read More

Read more

Nether Dallachy Landfill Engineering…

Construction of a new engineered landfill cell (Phase 8) with… Read More

Read more

RR Craigmore | Cell…

Construction of a new landfill cell (Cell 9) and capping… Read More

Read more

Abbey Quarter Temporary Bus/Car…

Construction of a temporary multi-functional bus and car park to… Read More

Read more

Foxrock Carpark Redevelopment

Transformation of a disused former railway site into a modern… Read More

Read more